Guide · Dock economics

How do you build a monthly packaging reorder list?

By Columbus Pack · Published

List every packaging item the dock uses, measure how much of each goes out per week, and set a reorder point for each: daily usage × lead time in days, plus a safety stock. Then group the items into one recurring order at a cadence that fits your storage, and check the list against real usage every month.

Step 1: list what you actually use

Walk the dock and the packing benches and write down every packaging item with its exact spec: pallet size and grade, each box size and ECT grade, film width, gauge and roll length, strap material and width, gaylord size and wall count, and the small things (seals, tape, labels, liners) that stop the line when they run out. A vague line such as "boxes" is how the wrong size arrives.

Step 2: measure usage

Use four to eight weeks of real data: goods-received counts against what is left on the shelf, or outbound shipments multiplied by the packaging each one takes. Note busy and quiet weeks separately; many docks have a seasonal peak where usage of boxes and film is far above average.

Step 3: set a reorder point for each item

reorder point = daily usage × lead time (days) + safety stock
safety stock  = daily usage × the extra days you want as cover

Lead time is the days from placing an order to having it on your floor; ask your supplier, and use the longest recent figure rather than the best. For an item you cannot ship without, such as the pallet your main customer requires, give it more cover days.

Step 4: choose a cadence

Some items suit a fixed schedule (film and strap every month), some a fixed quantity whenever they hit the reorder point (pallets, gaylords). Storage usually decides it: a truckload of flat cartons fits in a corner, a truckload of empty gaylords does not. On the supply list every line has its own cadence (weekly, every two weeks, monthly, quarterly or one time), and the builder adds up the monthly picture by product.

Step 5: put it on one order

One combined order per cycle means one delivery appointment, one invoice and one place to check what is coming. Send the whole list as one request and the quote comes back line by line.

Step 6: review monthly

  • Did anything run out? Raise its safety stock.
  • Is anything gathering dust? Lower the quantity or drop the line.
  • Has a customer changed its pallet or box requirement?
  • Are you receiving more gaylords, pallets or totes than you ship? Those can go back out as buy-back.

A starter list for a typical outbound dock

LineExample specUsual cadence
Pallets48 × 40 recycled, grade BWeekly or every 2 weeks
Shipping boxes2 to 4 RSC sizes, 32 ECTMonthly
Stretch filmHand 18 in × 1,500 ft, or machine 20 in × 5,000 ftMonthly
StrappingPET 1/2 in plus sealsQuarterly
Gaylords48 × 40 × 36, 3-wall, used OKAs needed

Use the calculator to size the film line from your loads per day, and the gaylord fit tool to pick the gaylord spec.

Last updated

Spotted something out of date? Email info@columbuspack.com.

Next steps

More in Dock economics